Pometeno brdo wind farm

WF Pometeno brdo is a wind farm located near Konjsko, in the vicinity of Dugopolje, just above A1 motorway and the Konjsko tunnel. It is set up, and connected to the electrical grid of 17 wind turbines. A total of 15 Končar KO-VA 57/1 wind turbines with a capacity of 1 MW and two Končar K80 wind turbines with a capacity of 2.5 MW were installed, bringing the total capacity of the wind farm to 20 MW. Mostly Croatian companies participated in the construction of the wind farm, i.e. 14 Končar Group companies and 15 subcontractors from Croatia. For the WF Pometeno brdo project, the total investment amounted to HRK 252 million, of which Končar invested 41.48% of its own funds. In addition to proving that they can produce equipment for wind turbines, Končar Inženjering also proved that they can offer services in the design and planning phase of construction, as well as commissioning and connection to the electricity grid even for the most demanding renewable energy projects.